Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
West Bengal Preparation Of Dpr For Bridge In Different Blocks Under Murshidabad Division Within Murshidabad District
03 Jul 2024
West Bengal Soil Exploration For The Proposed Conventional Bridge At Ch.220.00 Of D.b.m.c. (mouza-barabataspur, J.l. No 27, Block Md.bazar) Of Mollarpur Irrigation Sub-division Under Mayurakshi North Canals Division.
Estimated Cost :193145 INR
05 Jul 2024
West Bengal Foot Bridge At Ratneswarbati 6 No Sansad Under Pbg (ibrd And Sfc) 2022-23.
Estimated Cost :285819 INR
08 Jul 2024
Maharashtra Anjangaon Minor Project Main S.no. 576 M. Above C.d. Works And Ghodeghat Small Canal S.no. 480 M. Construction Of Above Vrb.
Estimated Cost :821319 INR
10 Jul 2024
Tamilnadu Construction Of Foot Over Bridge Near M/s. Concor At Sipcot Industrial Park Hi Tech Sez, Sriperumbudur.
Estimated Cost :8131450 INR
11 Jul 2024
Haryana Reconstruction Of Vr Bridge From Village Jakhal To Village Udaypur At Ghaggar River
Estimated Cost :95366962 INR
16 Jul 2024
West Bengal Sinking Of 200 Mm Dia Tube Well 60 Mtr Deep By Dr Rig Method Using Pvc Pipe Fibre Glass Strainer And Connecting Pipe Line At Near Canel Par East Side Of Road Bridge In Ward No 08 Under Nalhati Municipality. Tube Well No2
Estimated Cost :646810 INR
15 Jul 2024
Uttar Pradesh Construction Of 2 Lane Rob With Approaches In Lieu Of Lc No. 48 At Km 38/2-3 And Lc No. 61 At Km 49/2-3 Between Barhan-etah Section Under Dy.ce/c/kanpur On Prayagraj Division Of North Central Railway
Estimated Cost :937866600 INR
26 Jul 2024
West Bengal Special Civil Works Except P.way Works In Connection With Construction, Remodelling, Repair And All Outstanding Works Of Stations, Viaduct, Tunnel & Other Structures & Service Building From Salt Lake Sector-v (chainage (-)0.06 Km) To Sealdah (chainage 8.9
Estimated Cost :119647978 INR
23 Jul 2024
Andhra Pradesh Conducting Feasibility Study, Investigation, Detailed Survey With Dgps /total Station, Marking Of Alignment, Soil Investigation, Preparation Of Gad And Submission Of Dpr For Construction Of Rob/rub In Lieu Of Total 13 Lcs Over Gnt Division. Sw1:: . Gnt -k
Estimated Cost :8945261 INR
19 Jul 2024