Tenderskhoj
India
- Water and Sanitation
LOCATION SUMMARY DEADLINE
Punjab Construction Of Steel Bridge Single Span 73.866 Mtr. C/c Of Bearing At Rd 294476 Of Rajasthan Feeder Canal Crossing Village Khidkiyawala To Thandewala And Construction Of Steel Bridge Single Span 43.58 Mtr. C/c Of Bearing On Sirhind Feedercanal
17 Jul 2024
Punjab Drilling And Deve. Of 1 No. New Twll Of Size 300mmx200mm Upto 300 Mtr.depth Or Where Sufficient Quantity Of Potable Water Is Available Complete In All Respect In W.no.26 Near Suvidha Center At Kharar Distt. S.a.s. Nagar.
Estimated Cost :3972000 INR
04 Jul 2024
West Bengal M/r To Restoration Of Breach Point Near Ch. 20.0 Over Right Bank Of Dy. No.- 08/ D.b.b.c Under Bonta (i) Section Of Rampurhat (i) Sub Division With In M.n.c.d During The Year 2024-25
Estimated Cost :82919 INR
05 Jul 2024
India Supply Of Aprons Leather Bags Tool No. 1 , Case Binacular We-patt 37 , Utensil Cooking 150 Men Set Degchie 650m, Soldering Iron Electric 230volts- 75w, Kettle Camp Oral 13.6 Ltrs Cover
Qty : 963

17 Jul 2024
West Bengal Construction Of Covered Drain From Aleda Mullik House To Mehbub Mullik House At Keshabpur Under Begri Gp Under Domjur Panchyat Samity Activity Code-67842064
Estimated Cost :150000 INR
03 Jul 2024
Punjab Repair Of Sewer Line Due To Damaged By Heavy Rain By Providing Upvc Sewer Line And All Other Works Contigent Thereto Along Sirhind Canal Near Residence Of Sh. K.p Rana Former Speaker At Ropar.
Estimated Cost :205000 INR
04 Jul 2024
West Bengal M/r To Regulator Gate And Structure Including Canal Banks In Connection With Kharif Irrigation 2024 From Ch.3..00 To Ch.324.00 Of Dbmc Under Borobataspur (i) Section Of Mollarpur(i) Sub-division Under Mncdivision During The Period July 2024 To Octob
Estimated Cost :187947 INR
05 Jul 2024
Punjab Construction Of 4 Nos. Pump Chambers Including Gravel Pit, Providing And Fixing Of Pumping Machinery Of Suitable Capacity And Dozing Pump And All Other Works Contingent Thereto For Various Tubewells In Banur Town Distt S.a.s. Nagar.
Estimated Cost :1936000 INR
04 Jul 2024
West Bengal Operation And Maintenance Cost Of Community Drinking Water Purification Plant Under Raninagar-i G.p, Fund- 15th Cfc, Aap No.- 06/2023-24.
Estimated Cost :334222 INR
03 Jul 2024
West Bengal M/r To Regulator Gate And Structure Including Canal Banks In Connection With Kharif Irrigation 2024 From Ch 285.00 To Ch 292.00 And Ch 390.00 To Ch 413.00 And Ch 512.00 To Ch 530.00 And Ch 590.00 To Ch 600.00 Of Dbbc Under Bonta (i) Section Of Ram
Estimated Cost :214079 INR
05 Jul 2024