π Tender Overview
Contract Award for Contract awarded for Design (monitoring, control engineering, energy supply)
lot-0005, title: insula magna - design of hydrological monitoring system, description: the project titled "insula magna - implementation of water management tasks necessary for the sustainable inter-island innovation pilot project" (kehop_plusz-1.2.21-24-2025-00005) involves the design of a hydrological monitoring system. the task of the winning bidder: hydrological monitoring design task: β’ design of a simple remote monitoring station, execution level: 5 facilities β’ design of well measurement, execution level: 1 facility the hydrological monitoring tasks listed in the table for the facilities in the above facility list must be designed at the execution plan level according to the following requirements. the execution plans must be prepared according to the requirements of the hungarian chamber of engineers and the hungarian chamber of architects. the execution plan must include quantity calculations and a priced budget. the new remote monitoring stations must be integrated into the existing system of the north transdanubian water directorate. for this purpose, regular consultations must be held with the operator Γ©duvizig during the design work. the detailed task description is included in the procurement document. in consideration of the provisions of section 46 (3) of government decree 321/2015 (x. 30.) (hereinafter: kr.), the contracting authority draws attention to the fact that if the clear and understandable definition of the subject of the public procurement necessitated a reference to a specific brand, origin, type of thing, procedure, activity, person, patent, or trademark, the designation was made solely for the purpose of clearly defining the nature of the subject, and the phrase "or equivalent" is to be understood in every case. the contracting authority draws attention to the fact that in the case of offering an equivalent item, the equivalence must be proven by the bidder in their offer. the equivalence must be proven by the bidder using any appropriate means. any appropriate means may include, in particular, technical documentation, statements, or certificates from the manufacturer, or technical documentation, statements from an independent, professionally recognized accredited certifying/inspection organization. any doubts arising regarding the specific bidding elements must be fully dispelled by the bidder with proof that provides clear and verifiable evidence supporting their claims. lot-0008, title: kfcs - design of hydrological monitoring system, description: the project titled "reconstruction works of the i.bΓΆge (4+678-44+565) cross-section of the eastern main canal and its belt canals" (kehop_plusz-1.2.21-24-2025-00004) involves the design of a hydrological monitoring system. the task of the winning bidder: hydrological monitoring system design task: a) establishment of simple remote monitoring stations: design of a simple remote