Contract Awarded for Engineering procurement construction and commissioning EPCC of a proposed mixed development of Lot 6036 Block 26 Muara Tuang Land District and part of the River Bank reserve.Sarawak Consolidated Industries Bhd SCIB announced that the company and its wholly-owned subsidiary SCIB International Labuan Ltd SILL accepted letter of award and acceptance LOA for engineering procurement construction and commissioning EPCC contract in MalaysiaSCIB accepted a LOA from Lestari Asiabina Sdn Bhd for an EPCC contract located in Kuching Sarawak Malaysia worth RM421.97 million for a proposed mixed development of Lot 6036 Block 26 Muara Tuang Land District and part of the River Bank reserve. The mixed development projects comprises of several premises which is categorized into Blocks and expected to be completed in 108 months.The mixed development projects includes a total of eight blocks comprising od 20 storey office twin towers with 3-storey commercial podium 3-4 storey shophouses 12 storey service apartment open green with pedestrian walkways bicycles lance with green landscape 10 to 15 condominium and 2 story clubhouse 7-storey Putera House apartment and a total of 48 meters of new Drain Deserve..The works targeted to be completed in an approximate duration of 108 months which is divided into four stages of 27 months each.
π Key Information
π
Tender Reference No.
461552757
π
Publication Date
10 Apr 2021
π°
Estimated Value
MYR 421970000
π
Sector
Industry
π
Deadline
31 Dec 2029
π
Notice Type
Contract Awards
π
Location
Malaysia
π
Contract Duration
8 Years 8 Months 21 Days
π
Documents & Downloads
No documents found
π·οΈ CPV
No CPV found