📋 Tender Overview
Roads
The construction of a new bridge over the Pereira Stream began in San José
06/29/2026
Share
Today the construction of a new bridge over the Pereira Arroyo began, on Route 1, between kilometers 79,980 and 80,204, in the area of Costas de Pereira and Rincón del Pino, department of San José.
The work includes the demolition of the existing structure and the execution of work on the northern carriageway of the route. The work is expected to last until the end of November.
The new structure will have an approximate length of 134 meters and a width of 11.20 meters, will have shoulders and New Jersey-type reinforced concrete safety barriers, and will be designed to respond to the current demands of heavy traffic.
In addition, it will improve road safety and traffic conditions in this section of Route 1, strengthening the road infrastructure in the area.
The works, carried out by the company José Cujó S.A., are part of the project “Route 1: Bridges over Aº Pereira, Aº Pavón, Aº La Boyada and Aº Cufré”, which aims to improve these structures, adapting them to current traffic, cargo and safety requirements.
Affectation in circulation
During the work period, traffic detours and reduced circulation will be recorded. Vehicles must circulate on the southern road of Route 1. Meanwhile, agricultural machinery must use the Tala Pereira Road as an alternative route.
Users are asked to circulate with caution, respect the installed signage and follow the instructions provided in the work area.
Image gallery
1/1
The construction of a new bridge over the Pereira Stream began in San José
Download image
: Construction of a new bridge over the Pereira Stream began in San José
Download all images (.zip 477.82 KB)
2 images, 477.82 KB
Tags
Roads