π Tender Overview
The Princely Government of Monaco has entrusted VINCI Construction with the structure core and shell for the new Princess Grace Hospital in Monaco. This 98 million contract covers construction of the first new building which will comprise 16 storeys and a 6-level underground car park and span a total of 65000 sq. metres of floor space.This large-scale operation for the Principality is part of its plan to extend and modernise Princess Grace Hospital. The new building will be next to the existing hospital and construction work will not disrupt the hospitals activity. The project is also in a densely populated area and seismic zone. To carry out and facilitate interaction with the other trades VINCI Constructions teams will use a BIM Building Information Modelling system for construction design. Works will be completed at the end of 2025.A dome will be set up during the earth-moving and earth-retaining works to dampen noise pollution. It will comprise 70 cables each 37 metres long holding 2800 sq. metres of sound-absorbing sheets to reduce noise from the construction work to up to 12 decibels dBA.This project is also part of VINCI Constructions plan to mainstream the use of Exegy low-carbon concrete 85 of the concrete used at the worksite will be low-carbon and thus reduce greenhouse gas emissions by 30. The envelopes bioclimatic design will contribute to thermal comfort in the building and is aimed at obtaining NF HQE Trs Performant certification. The entire building will have highperformance-concrete rippling sun breakers which will provide patients with many openings to let in daylight and most of the rooms will have a sea view.