π Tender Overview
Adani Power Limited is planning to construct a 2 x 800 MW thermal power project at Mahan, Madhya Pradesh.
BHEL will be responsible for supplying critical equipment such as boilers, turbines, and generators. Additionally, BHEL will oversee the erection and commissioning of these projects, which are scheduled for completion within a timeframe of 49 to 55 months.