π Tender Overview
Scope :
Avce Substation is a 400/110kV substation located at Avce, Littoral, Slovenia. The substation is proposed and is expected to be commissioned in 2028. The Avce Substation will be operated by ELES doo.
The designed voltage level of the substation is 400/110kV and the operating voltage level is 400/110kV. The step in voltage of the project is 400kV and the step out voltage is 110kV