Scope of WorkConstruction of 1.2-GW Baltic Power offshore wind project in Polish waters.DescriptionThe project partners need onshore cable lines an onshore substation and overhead lines that will connect the wind farm with the Polish national grid. They will select an experienced contractor and sign an engineering procurement and construction EPC agreement covering the full scope of works. Work under the EPC contract will involve the construction of all components including overhead lines the delivery installation and commissioning of all required equipment as well as design and technical analysis.The 6.5-km 4.03-mile onshore cable will be routed via underground single-core AC cables with an operating voltage of 220 kV or 275 kV.It will start atthe Transition Joint Bayslocated near shore and end at the Baltic Powerhigh voltage onshore substation from where the power will be transferred to National Grid via 400 kV overhead lines. The construction of the Baltic Power wind farm is planned to be launched in 2023 and be finalised in 2026.
π Key Information
π
Tender Reference No.
465334297
π
Publication Date
06 Sep 2021
π°
Estimated Value
N/A
π
Sector
Renewable Energy
π
Deadline
31 Dec 2026
π
Notice Type
Projects
π
Location
Poland
π
Contract Duration
5 Years 3 Months 25 Days
π
Documents & Downloads
No documents found
π·οΈ CPV
No CPV found
Need help with this bid?
Our bid experts can help you find, evaluate & win more tenders.