Renewable Energy Infrastructure and construction Engineering

Construct Green Hydrogen Tender

๐Ÿ›๏ธ ACWA POWER
๐Ÿ“„ Tender ID: 454823974 ๐Ÿ“… Published: 05 Jul 2024

๐Ÿ“‹ Tender Overview

Scope of Work:
To Build Green Hydrogen Plant in north-west Saudi Arabia.

Description:
The green hydrogen-based ammonia production plant will be built at a site in north-west Saudi Arabia where NEOM is developing a smart city and innovation hub. The plant, in which the three partners will have equal ownership, will supply 650 tonnes of green hydrogen for exporting globally.

The plant will integrate with over 4GW of renewable energy sources, from solar, wind and energy storage and is slated to come onstream in 2025. Electrolysyer technology will be provided by Thyssenkrupp. Air Productsโ€™ equipment will be produce nitrogen by air separation, while 1.2 million tonnes, annually, of green ammonia will be manufactured using Haldor Topsoe technology. Air Products will be the exclusive offtaker of the green ammonia and intends to transport it around the world to be dissociated to produce green hydrogen for the transportation market.

Harnessing the unique profile of NEOMโ€™s sun and wind to convert water to hydrogen, this project will yield a totally clean source of energy on a massive scale and will save the world over three million tons of carbon dioxide emissions annually and eliminate smog-forming emissions and other pollutants from the equivalent of over 700,000 cars. ACWA Power has a proven track record of leveraging pioneering renewable technologies to deliver carbon-free power at the lowest cost. Based in NEOMโ€™s industrial cluster, and enabled by its unique mandate, this investment will integrate and localise cutting-edge technologies that will harness solar and wind power to produce sustainable and globally accessible green energy.

Other owners:
2) NEOM
Saudi Arabia
https://www.neom.com/
3) POSCO Holdings
6261, Donghaean-ro, Nam-gu, Pohang-si, Gyeongsangbuk-do, Republic of Korea
Tel: 82-54-220-0114
https://www.posco.com/

Previous Events:
June 2023- Larsen & Toubro has achieved important milestones for the Power Elements and Grid packages of the worldโ€™s largest green hydrogen plant Project at NEOM.
May 2023- NEOM Green Hydrogen Company announces financial close of $8.4bn for Worldโ€™s Largest Green Hydrogen Project.
December 2022 - L&T Signed EPC Contract for NEOMโ€™s Green Hydrogen Project.
July 2022- Saudi Public Investment Fund-owned ACWA Power Co. has signed a memorandum of understanding with South Koreaโ€™s POSCO Holdings to jointly explore the production of green hydrogen.
June 2022- Longitude Engineering, ABL Groupโ€™s engineering, advisory, and design arm, has been awarded a contract to provide engineering support to Air Products on the NEOM green hydrogen project in Saudi Arabia.
May 2022- ACWA Power begins construction of green hydrogen plant.
May 2022- Financial close for the planned $5bn green hydrogen and ammonia project to be developed at NEOM on the Red Sea Coast in Saudi Arabia is expected by the end of the first half of 2022.
April 2022-ACWA Power has signed a contract worth $900 million relating to the NEOM

๐Ÿ” Key Information

๐Ÿ“„
Tender Reference No.
454823974
๐Ÿ“…
Publication Date
05 Jul 2024
๐Ÿ’ฐ
Estimated Value
N/A
๐ŸŒ
Sector
Renewable Energy
๐Ÿ“…
Deadline
31 Dec 2026
๐Ÿ“
Notice Type
Projects
๐Ÿ“
Location
Saudi arabia
๐Ÿ“‘
Contract Duration
2 Years 5 Months 26 Days

๐Ÿ“ Documents & Downloads

No documents found

๐Ÿท๏ธ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

๐ŸŽง Talk to Bid Expert
๐Ÿ•’ Submission deadline
59
days remaining ยท 31 Dec 2026
๐Ÿ”” Set Alert

๐Ÿงญ Quick Facts

Authority ACWA POWER
Country Saudi arabia
State / UT N/A
Tender Type Project Information
Currency USD
Similar Tenders
Loading similar tendersโ€ฆ