๐ Tender Overview
Scope :
Construction of Dekemhare Solar Power Plant project in Eritrea. A tender to select a consultant to help in the development of the 30 MWp Dekemhare Solar Power Plant, is being launched by Eritrea, and the African Development Bank (AfDB).
The consultant is required to support the relevant authorities at all project stages, particularly during the tendering process and contract negotiations. Aside from supervising the construction projects, the consultant will also take part in the projectโs review. It is said that the consultant will approve detailed designs, EPC contractor construction work, and technical reports.
The consultantโs roles will extend beyond the phase of development. The roles will include factory acceptance testing (FAT) for major equipment components. He or she will oversee the E&S Management Planโs (ESMP) implementation. The contract will also include the development of the projectโs executing agencyโs capacity as well as the monitoring, control, and incorporation of solar energy forecasts into daily dispatch schedules. It will also involve the operation and maintenance of solar PV and battery storage systems. In March, 2023 the African Development Bank (AfDB) approved funding of US$49.9 million for the Dekemhare plant.
The 30 MWp solar PV plant will be set up outside of Dekemhare, in the Debub area. The town is 40 kilometers to the southeast of Asmara, Eritreaโs capital.
To stabilize the grid of the state-owned Eritrean Electricity Corporation (EEC), the plant is expected to be connected to a battery power storage system. A 66 kV substation and a 500 m transmission line are additional projects the Eritrean government is looking to establish.
The project is part of Asmaraโs strategy to diversify its electricity mix. The nation of East Africa is 90% dependent on fossil fuels, especially diesel, for the generation of electricity. This is according to the 2015 analysis of the International Energy Agency (IEA).
On 12 August, contractors were invited to submit bids without prequalification for the design and build contract. The deadline for submissions is 17 October. The project site is 40km southeast of the capital Asmara.