๐ Tender Overview
Project :PFO-002-14
Project Description : -There are a number of corrections required at Huron Lodge. The most significant are correcting issues related to the building envelope water leaks (walls, windows, roof, and parapets), the heating, cooling, ventilation, & humidification systems, plumbing, and flooring repairs. An architectural/engineering consultant is required to assess the deficiencies and recommend the best, most cost effective solutions.