📋 Tender Overview
Scope of Work:
Jafurah second expansion phase project - Package 1 – gas processing plant and main process units.
Package 1 – gas processing plant and main process units: Three gas treatment trains, with a capacity of 700 million cf/d each, including Gas inlet separation/booster compressor, Acid gas removal units, Hydrocarbon condensate stabilsation, Mercury removal, Dehydration units, NGL recovery, Sales gas compression units, Equipment and pipe rack foundations, access roads, and additional buildings such as process interface buildings, operation, maintenance and engineering buildings, Static, rotating and packaged equipment, Process and utilities above ground piping within the gas processing facilities, Underground piping network for fire water, sanitary water, oily water systems, Electrical work, including new gas-insulated substation, main substations, unit substations and their associated equipment and electrical material, Instrumentation work, including expanding existing process automation systems, expanding existing PIBs, Steel structure work for main and unit pipe racks, in addition to equipment structures.