Scope :
Maasvlakte HVDC Converter Station is a 525/380kV substation located at Maasvlakte, South Holland, the Netherlands. The substation is planned and is expected to be commissioned in 2028. The Maasvlakte HVDC Converter Station will be operated by TenneT TSO B.V..
The designed voltage level of the substation is 525/380kV and the operating voltage level is 525/380kV. The step in voltage of the project is 525kV and the step out voltage is 380kV.
Maasvlakte HVDC Converter Station is owned by TenneT TSO B.V..