π Tender Overview
Scope of Work:
Madaba Wastewater Treatment Plant Expansion.
Description:
The Madaba WWTP is located approximately 3 kilometers (km) south from Madaba City center. The Madaba WWTP expansion is a new 16,000 m3/d (average annual daily flow, which does not include the existing WWTP capacity) facility to be constructed in parallel to the existing WWTP that is to remain operational throughout the construction of the new facilities. The Madaba Wastewater Treatment Plant (WWTP) expansion project aims to treat wastewater more efficiently and sustainably. The biological treatment process begins with primary clarifiers, followed by plug-flow Biological Nutrient Removal (BNR) treatment system, and ends with secondary clarifiers. On the solids side, primary sludge thickening and waste activated sludge thickening are followed by anaerobic digestion for sludge stabilization, and the sludge dewatering and drying. The anaerobic digestion system is designed to include the future installation of a CHP system to utilize the by-product (biogas) produced by the anaerobic digestion process.
Financing Sources:
2) United States Agency for International Development (USAID)
1300 Pennsylvania Avenue, NW
5.08C-111 RRB
Washington, DC 20523
United States
Tel: 202-712-1110
Fax: 202-216-3906
https://www.usaid.gov/
3) European Commission (EU)
Charlemagne building
Rue de la Loi 170
1040 Brussels
Belgium
Tel: +32 2 299 11 11
https://ec.europa.eu/