📋 Tender Overview
Scope :
Maragle Substation – New – 500/330 kV is a 500/330kV substation located at Maragle, New South Wales, Australia. The substation is proposed and is expected to be commissioned in 2028. The Maragle Substation – New – 500/330 kV will be operated by TransGrid.
The designed voltage level of the substation is 500/330kV and the operating voltage level is 500/330kV. The step in voltage of the project is 500kV and the step out voltage is 330kV.
Maragle Substation – New – 500/330 kV is owned by TransGrid