π Tender Overview
Scope of Work:
Master Gas System Expansion - Phase 3 - Package 5 Gas Pipelines from EWPS-3 to EWPS-4.
Description:
Package 5: Laying 56-inch east-west gas pipelines three and four from EWPS-3 to EWPS-4, covering 166km. The project has several interfaces with different contractors and government utilities. The expansion of the existing Master Gas System network is required to meet internal consumption needs, as demand has been increasing, and to ensure gas supply sales to industrial hubs like Shoaiba and Shoqaiq by 2028, in line with the Kingdomβs Vision 2030. The detailed scope of works includes two 56 pipes between EWG 3 and 4 covering 2 lines of 85 km 56 in the existing corridor, scraper launchers and receivers, starting from BGCS 3 in Wasea and ending at EWPS 4 in Riyadh. Each pipeline has 10 MLIV stations where each MLIV comprises of the isolation valves for both pipelines. The scope is also to provide five jump overs, three hot taps and five tie-ins. The programme aims to support the Saudi Aramco objective to efficiently meet the countryβs growing energy demand by replacing liquid fuel with sales gas.