π Tender Overview
Scope :
Construction of 250-megawatt renewable energy-gas power plant in Zhanaozen, Kazakhstan.
The project is Kazakhstanβs first hybrid power plant integrating solar, wind, and gas power to produce and supply low-carbon, stable electricity to KMG subsidiaries in the [Mangystau] region .
The project pioneers the hybrid combination of state-of-the-art renewable power plants, developed in collaboration with Eniβs subsidiary Plenitude, and a gas power plant to balance and to stabilize the electricity production, overall leveraging Eniβs international industrial expertise.