Scope The railway expansion in 2035 aims to remove the bottlenecks in the rail network - in passenger transport these are the Arc lmanique Zurich and Bern areas. In particular the sections Geneva Lausanne Yverdon Bern Thun Solothurn Olten Zurich Winterthur and Zurich-Zug-Rotkreuz are overloaded. To this end Parliament approved a total package of around CHF 13 billion in 2019.The rail line expansion between Zurich and Winterthur aims to increase rail traffic capacity by 30. INGE LED is responsible for general planning from the preliminary design phase through to construction. Section 1 comprises the perimeter between the Winterthur rail station and the portal of the Brttener tunnel some 3 km of track. Core elements of this section are the Neumhle overpass the Storchen underpass and an upgrade of the Tss rail station.
π Key Information
π
Tender Reference No.
464793022
π
Publication Date
18 Aug 2021
π°
Estimated Value
USD 14194050000
π
Sector
Railways
π
Deadline
31 Dec 2035
π
Notice Type
Projects
π
Location
Switzerland
π
Contract Duration
14 Years 4 Months 13 Days
π
Documents & Downloads
No documents found
π·οΈ CPV
No CPV found