📋 Tender Overview
Scope :
Milan Substation – Upgrade – 500 kV is a 500kV substation located at Milan, Lombardy, Italy. The substation is proposed and is expected to be commissioned in 2032. The Milan Substation – Upgrade – 500 kV will be operated by Terna SpA.
The designed voltage level of the substation is 500kV and the operating voltage level is 500kV. The step in voltage of the project is 500kV.
Milan Substation – Upgrade – 500 kV is owned by Terna SpA.