Consultancy Infrastructure and construction

Moblan Lithium Tender

πŸ›οΈ SAYONA MINING
πŸ“„ Tender ID: 507022468 πŸ“… Published: 08 Aug 2024

πŸ“‹ Tender Overview

Scope :
Moblan Lithium Project. The mine is expected to have an average lithium production of 300mtpa.
The Moblan lithium project situated in Quebec, Canada, is set to be developed as an open-pit mine.

The mine is jointly owned by Australia-based mining company Sayona Mining (60%) and Investissement Quebec (40%), a guidance and financial solutions provider.

The definitive feasibility study for the project was completed in February 2024. The mine is estimated to have a life of mine (LOM) of 21.1 years with an investment capital of $722m.

The first production from the mine is anticipated to commence in April 2027. The mine is expected to have an average lithium production of 300 million tonnes per annum (mtpa).
Moblan lithium project location

The Moblan lithium project is located in the Eeyou Istchee James Bay Hub in north-western Quebec, Canada. The project encompasses 20 mineral claims, covering an area of 433ha.
Geology and mineralisation

The property lies within the Frotet-Evans greenstone belt, a component of the Archean Superior province.

Lithium was initially discovered on the Moblan property in the 1970s, with the first drilling occurring in 2007.

The geology of the Moblan property is characterised by a large north-east trending gabbro, bordered to the north-west by mafic volcanics and lesser sedimentary rocks.

The Archean bedrock is sporadically covered by glacial tills, which are not more than 3m to 4m thick.

The gabbro serves as the principal host rock for lithium-bearing pegmatite. The pegmatites belong to the albite spodumene class of lithium-cesium-tantalum pegmatites.
Reserves

The Moblan lithium project is estimated to contain a probable reserve of 34.5 tonnes (t) grading 1.36% lithium oxide, as of February 2024.
Mining method

The project will employ open-pit mining methods, utilising a conventional excavator and truck fleet. The LOM will involve 13 months of pre-production, followed by a 19-year production period.

Two open pits namely the Moleon pit and the Main pit are proposed to be developed over the life of the mine.

The Moleon pit will cover the Moleon domain while the Main pit will incorporate the Main, Inter, and South domains. Mining will proceed with a strip ratio of 2.3:1.

The Main, Inter, and South geological zones will converge into a single pit, designated as the Main pit.

The Main pit will have an optimal depth of 200m from the highest topographic point. Mining in the Main pit will be conducted with a bench width ranging between 6m and 9.4m and a bench height of 20m.

The Moleon Zone will necessitate a separate pit design and access.

The optimal depth of the Moleon pit will be 130m. Mining in the Moleon pit will be conducted with a bench width ranging between 6.5m and 11.7m and a bench height of 20m.

Both pits will feature a double-lane access ramp of 28m and a single-lane access ramp of 17m.

The mining fleet will consist of three 7mΒ³ backhoes, six 92t mi

πŸ” Key Information

πŸ“„
Tender Reference No.
507022468
πŸ“…
Publication Date
08 Aug 2024
πŸ’°
Estimated Value
N/A
🌐
Sector
Consultancy
πŸ“…
Deadline
30 Apr 2027
πŸ“
Notice Type
Projects
πŸ“
Location
Canada
πŸ“‘
Contract Duration
2 Years 8 Months 22 Days

πŸ“ Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
πŸ•’ Submission deadline
180
days remaining Β· 30 Apr 2027
πŸ”” Set Alert

🧭 Quick Facts

Authority SAYONA MINING
Country Canada
State / UT N/A
Tender Type Project Information
Currency N/A
Similar Tenders
Loading similar tenders…