π Tender Overview
Scope :
Mombutota CX is a 300MW hydro power project. It is planned on Luapula river/basin in Luapula, Zambia. Mombutota CX is a 300MW hydro power project. It is planned on Luapula river/basin in Luapula, Zambia. The project is currently in permitting stage. It will be developed in single phase. The project construction is likely to commence in 2023 and is expected to enter into commercial operation in 2026. The project is being developed by Copperbelt Energy and ZESCO. The project is currently owned by ZESCO.
Mombutota CX is a run-of-river project. The net head of the project will be 65.4m. The project is expected to generate 1,449 GWh of electricity. The project cost is expected to be around $482.91m.
The project construction is expected to commence from 2023. Subsequent to that it will enter into commercial operation by 2026.