Scope of Work:
To Build 300-MW/716-MWh battery energy storage system (BESS) in the municipality of Trossingen.
Description:
The construction is scheduled to begin in 2027. The facility is expected to become operational in 2028. The large-scale battery storage system will be constructed in close proximity to the substation near Trossingen.