ScopeKenya is planning on building its first nuclear power plant in the next eight to ten years. The Nuclear Power and Energy Agency NuPEA has contracted China National Nuclear Corporation CNNC to help establish the best location for the Nuclear power plant. The Indian Ocean Lake Turkana and Lake Victoria have been identified by the Nuclear Power and Energy Agency as the most suitable sites for housing the power plant. the Rift Valley was intentionally left out as a lot of water will be needed to cool the plant. NuPEAs vision is to set up a 1000-megawatt MW power plant by 2027 and rising its capacity to 4000MW by 2033 so that nuclear electricity is becoming one major component of Kenyas energy. In preparation for this the agency has trained 29 Kenyan graduates who hold Masters degrees in Nuclear Engineering from various top universities in China Russia and Korea. The National Assemblys Energy committee was told that the establishment of the power plant location by NuPEA and the Chinese firm is expected to cost taxpayers around 1.5 billion shillings. NuPEA considers this project a long-term solution to the ever-rising fuel costs especially during droughts and the best way to cut carbon emissions from the power generating sector. while the agency is planning on all these developments in the energy sector the Ministry of Energy is arguing that Kenya should only go that way after they have exhausted other sources of energy.
π Key Information
π
Tender Reference No.
445767928
π
Publication Date
18 Jul 2019
π°
Estimated Value
N/A
π
Sector
Energy, Power and Electrical
π
Deadline
31 Dec 2027
π
Notice Type
Projects
π
Location
Kenya
π
Contract Duration
8 Years 5 Months 13 Days
π
Documents & Downloads
No documents found
π·οΈ CPV
No CPV found
Need help with this bid?
Our bid experts can help you find, evaluate & win more tenders.