๐ Tender Overview
Scope of Work:
Establishment of OXAGON.
Description:
OXAGON will be the catalyst for economic growth and diversity in NEOM and the Kingdom, further meeting ambitions under Vision 2030. OXAGON will contribute to redefining the worldโs approach to industrial development in the future, protecting the environment while creating jobs and growth for NEOM. It will contribute to Saudi Arabiaโs regional trade and commerce, and support creating a new focal point for global trade flows.
OXAGON will establish the worldโs first fully integrated port and supply chain ecosystem for NEOM. The port, logistics and rail delivery facility will be unified, providing world-class productivity levels with net-zero carbon emissions, setting global benchmarks in the adoption of technology and environmental sustainability.
The agile and integrated physical and digital supply chain and logistics system will allow for real-time planning, resulting in secure on-time delivery, efficiency and cost-effectiveness for industry partners.
At OXAGONโs core will be the adoption of the most advanced technologies such as the Internet of Things (IoT), human-machine fusion, artificial and predictive intelligence, and robotics, all of which are coupled to a network of fully automated distribution centers and autonomous last-mile delivery assets to drive NEOMโs ambitions of creating a seamless integrated, intelligent and efficient supply chain.
The net-zero city will be powered by 100% clean energy and will become a focal point for industry leaders who want to pioneer change to create the advanced and clean factories of the future.
Seven sectors form the nucleus of OXAGONโs industrial development, with innovation and new technology creating a vital base for these industries. These industries are sustainable energy; autonomous mobility; water innovation; sustainable food production; health and well-being; technology and digital manufacturing (including telecommunications, space technology and robotics); and modern methods of construction; all powered by 100% renewable energy.
They are expecting first residents in 2024. All of the onshore development will be complete by 2030 and the beginning of the offshore development will be very much underway at that point. Logistics solutions will be in place by 2025 and will continue to progress as deploy new technologies such as state-of-the-art high-speed rail and aerial taxis. The containerization of port is already underway and will begin building advanced integrated port logistics facilities soon.