๐ Tender Overview
Scope :
Pervari is a 409.4MW hydro power project. It is planned on Botan river/basin in Siirt, Turkey. It will be developed in a single phase. The project construction is likely to commence in 2029 and is expected to enter into commercial operation in 2031.
Description
The project is being developed and currently owned by Enerjisa Enerji Uretim. Pervari is a reservoir based project. The hydro reservoir capacity is planned to be 96.3 million cubic meter. The gross head and net head of the project will be 158m and 153.99m respectively. The penstock length will be 158m. The project is expected to generate 886.52 GWh of electricity.
The hydro power project consists of 2 turbines, each with 9.2MW nameplate capacity.
The hydro power project consists of 2 turbines, each with 195.5MW nameplate capacity.
The project has 2 electric generators that will be installed at the project site.
Development status
The project construction is expected to commence from 2029. Subsequent to that it will enter into commercial operation by 2031.
Once operational, the Pervari dam and HPP will eliminate approximately 460,000 tons of CO2 emissions annually. The project will alleviate the increasing demand for energy by supplying low-carbon electricity to over 180,000 households. Not only will the Pervari plant benefit the national economy by adding 300 MW to the network, it will also boost the regional economy through employment creation.