π Tender Overview
Scope: A new expressway, that will link the Cambodian capital Phnom Penh with Vietnam,
This project will implement the following construction technical work:
* 10 cm thick AC concrete and 12 cm wide ATB concrete, 24.5 m wide, 4 lanes for traffic (2 lanes to 2 lanes), each lane 3.75 meters wide, Khoeun Suon divides traffic in the middle of the road, 3 meters wide, 2.5 meters wide concrete pavement and red gravel sidewalk 0.75 meters wide on both sides.
* Constructed 26 main and medium bridges with a total length of 2,266 meters, 16 small bridges with a total length of 256 meters and installed all kinds of sewers in 197 places.
* Construction of 5 interchange roads, 204 large and small tunnels.
* Construction of 2 service areas, 1 parking area, 3 maintenance centers and 6 payment booths.
* Equipped road equipment including traffic signs, lights, markers, milestones and safety barriers according to the technical standards of the expressway.
* This expressway allows all types of vehicles to drive at speeds of up to 100 and 120 km / h.
* This project will include the construction of cross-border infrastructure, with the Royal Government in charge of land acquisition for the site and the construction of cross-border infrastructure.
The project is planned to cost a total investment of about 1.35 billion US dollars under the form of construction investment β Transaction-Transfer (BOT) for a period of 50 years, of which 20% is invested by China Bridge and Road Corporation and 80% is company loan. The project will be built by the China Bridge and Road Corporation (CRBC), with a construction period of 48 months and scheduled for completion in 2027.