Scope :
Plovdiv Substation – Upgrade – 400 kV is a 400kV substation located at Plovdiv, Plovdiv, Bulgaria. The substation is proposed and is expected to be commissioned in 2027. The Plovdiv Substation – Upgrade – 400 kV will be operated by Electroenergien Sistemen Operator EAD.
The designed voltage level of the substation is 400kV and the operating voltage level is 400kV. The step in voltage of the project is 400kV.
Plovdiv Substation – Upgrade – 400 kV is owned by Electroenergien Sistemen Operator EAD.
🔍 Key Information
📄
Tender Reference No.
507782351
📅
Publication Date
31 Aug 2024
💰
Estimated Value
N/A
🌐
Sector
Energy, Power and Electrical
📅
Deadline
31 Dec 2027
📝
Notice Type
Projects
📍
Location
Bulgaria
📑
Contract Duration
3 Years 4 Months
📁