π Tender Overview
Scope :
Liebherr-Werk Bischofshofen is planning to expand its production capacity by building an additional manufacturing plant for small wheel loaders in Wildon, Styria. The new production site is scheduled for completion in 2029.
The Liebherr Group's wheel loader production plant in Bischofshofen employs 1,200 people on a site covering 170,000 square metres. With its present capacity, up to 7,000 wheel loaders can be produced each year. In the medium term, the company expects demand to reach 10,000 units per year, which means that production capacity has to be expanded. new production facility on a 200,000-square-metre site in Wildon. The new facility will manufacture the small wheel loader models L 504 to L 518, as well as models for partners John Deere and Claas.location of the new site offers advantages that make it attractive. In particular, the rail connection and the proximity to the Cargo Centre Graz (CCG) allow efficient material supply and the dispatch of finished products. This optimizes production processes and minimizes environmental impact by reducing lorry transport.