Varin Substation is a 400kV substation located at Varin, Zilina, Slovakia. The substation is proposed and is expected to be commissioned in 2028. The Varin Substation will be operated by Slovenska elektrizacna prenosova sustava AS.
The designed voltage level of the substation is 400kV and the operating voltage level is 400kV. The step in voltage of the project is 400kV.
Varin Substation is owned by Slovenska elektrizacna prenosova sustava AS.
๐ Key Information
๐
Tender Reference No.
507076734
๐
Publication Date
10 Aug 2024
๐ฐ
Estimated Value
N/A
๐
Sector
Energy, Power and Electrical
๐
Deadline
31 Dec 2028
๐
Notice Type
Projects
๐
Location
Slovakia
๐
Contract Duration
4 Years 4 Months 21 Days