Aviation Consultancy Airports

Zurich Airport Dock Tender

πŸ›οΈ FLUGHAFEN ZRICH
πŸ“„ Tender ID: 477108027 πŸ“… Published: 22 Aug 2022

πŸ“‹ Tender Overview

Scope :
A new sustainable Dock A will be developed at Zurich Airport to replace the ageing Dock A by 2033.

Flughafen ZΓΌrich, the owner and operator of Zurich Airport, plans to redevelop the airport’s core infrastructure, including Dock A, the Dock A apron, and the tower, as they have reached the end of their life. The new Dock A will be constructed to the north of the existing dock.

Flughafen ZΓΌrich conducted a two-stage design competition to select a plan for the redevelopment of the ageing Dock A in 2020. The Raumfachwerk (Space Framework), led by Bjarke Ingels Group (BIG), HOK Group, and 10:8 Architekten, was selected to work on the redevelopment project in June 2022.

The construction of the new Dock A is scheduled to begin in 2030, with an estimated investment of Sfr700m ($704.7m).

Zurich Airport is one of the world’s most environment-friendly airports.
Design of new the Dock A at Zurich airport

The new Dock A, including the new tower and the dock base, will be located adjacent to the existing Airside Centre and Terminal 1. It will be developed with seven floors and will have two main areas- the central hub and the pier.

The new dock will include Schengen and non-Schengen gates, lounges, airside retail, offices, and a new air traffic control tower, along with an extension of the immigration hall. The dock will enhance the passenger experience with a better view of the apron due to large window fronts and spacious waiting areas at the gates.

The new building will contain the dock, the new tower, and the dock base. The equilateral triangle-shaped dock base will connect the existing Airside Centre with the passenger levels in the dock through the underground passport control hall.
Structure details

The new Dock A will be primarily constructed from sustainable wood on the passenger levels, based on centuries-old Swiss tradition design. The main loadbearing system of the dock will have V-shaped wooden trusses and the outer walls will be fitted with wooden trusses. Wooden ceilings with more than a 12-metre distance between beams will be hung in the trusses.

An up to six-storey route area will be built with wooden hollow box ceilings, which will be supported by steel girders. The whole wooden structure will be supported by a reinforced concrete substructure.

The wooden truss roof of the central hub will seamlessly move into the air traffic control tower, providing more structural stability as a supporting concrete structure.
Amenities at the new Dock A

The retail and cuisine range will be expanded at the new dock base. The short distances at the airport will continue to exist and will be made more attractive by the adding new rooms.

The interiors will be flexibly designed to accommodate future modifications.
Sustainability features

The new Dock A will be constructed from solid wood to reduce CO2 emissions. Wood for the project is expected to arrive from Switzerland and neighbouring countries.

The whole

πŸ” Key Information

πŸ“„
Tender Reference No.
477108027
πŸ“…
Publication Date
22 Aug 2022
πŸ’°
Estimated Value
USD 701800000
🌐
Sector
Aviation
πŸ“…
Deadline
31 Dec 2033
πŸ“
Notice Type
Projects
πŸ“
Location
Switzerland
πŸ“‘
Contract Duration
11 Years 4 Months 9 Days

πŸ“ Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
πŸ•’ Submission deadline
2617
days remaining Β· 31 Dec 2033
πŸ”” Set Alert

🧭 Quick Facts

Authority FLUGHAFEN ZRICH
Country Switzerland
State / UT N/A
Tender Type Project Information
Currency USD
Similar Tenders
Loading similar tenders…